Van Oord has a contract for the replacement of a dual 10 km long oil export line. The client is Shell Gabon Africa
I’m responsible for al the lift-plans , and accompany the heavy lifts during the whole operation.Van Oord will deploy shallow water pipe lay barge “Stingray” with the 500 mt Liebherr.

Client : GDF Suez.
Contractor : Kenz/Figee cranes
Crane : Terex Commondil